This project involved the Stripout of a former furniture store. We undertook minor building works including new underground drainage, acoustic/fireproof ceilings and some structural repairs. The shopfitting works were carried out in three weeks which included the manufacture and installation of the 3No timber shopfronts and signage.Forum worked very closely with Paddy Power who registered their complete satisfaction with both the level of finish and the fast track programme achieved.


