This project involved the stripping out of two high street units, taking the premises back to its original single unit occupation. The fit out was a departure from the standard Paddy Power shop fit, involving the introduction of new finishes and layout. Forum Contracts worked closely with Paddy Power in respect of all re-design matters.


